Portal BASE · ID 11184431

612 days between signing and publication

União das Freguesias de Querença, Tôr e BenafimA contratação de Serviços de Silvicultura preventiva destinados à limpeza de Bermas e Valetas ao longo dos caminhos e ruas com cerca de 2 m para além dos seus limites, incluindo limpeza dos detritos, lixo e algumas terras existentes, assim como todos os trabalhos e materiais inerentes - fornecimento por lotes.

Who contracts with whom?

Recorded contract value9,350.00 €legacy reported value
Recorded suppliersNo supplier identified in the record

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

612 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

612 days between signing and publication

Signing is recorded on 2023-05-23 and publication on 2025-01-24, an interval of 612 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

The supplier’s identification is incomplete

The record names no supplier, or one supplier has no tax identifier. This describes incomplete data, not the absence of an award recipient.

Question for the public body

Which supplier and tax identifier appear in the original contract, and why are they missing from the record?

Documents and records to verify

Open the contract and award documents. Ask the public body to identify the recipient and correct or explain the missing fields.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
74,800.00 €
Contractual price
Not available
Reported final price
9,350.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Not available

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Consulta Prévia
CPV
77000000
Contract Type
Aquisição de serviços
Location
Portugal, Faro, Loulé
Publication
2025-01-24
Celebration
2023-05-23

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 3 (5)

Missing fields: contractual price, suppliers

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 612 days after signing (threshold: 10)
Publication Date
2025-01-24
Signing Date
2023-05-23
Days Late
612

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

C1 · Missing Supplier NIF

A recorded supplier has no NIF, or a positive reported final price has no recorded supplier. This describes source completeness.

Source evidence
Rule
C1 no winner recorded: awarded contract (effective price > 0) has no supplier identified

C1_MISSING_WINNER_NIF · MEDIUM · 2026-03-06 · Not available

Experimental indicators and advanced analysis

A5 · Proximity to configured amounts

Base value lies within 5% below one of the configured comparison amounts. Proximity alone does not establish splitting or a legal violation.

Source evidence
Rule
A5 threshold splitting: price within 5% below 75000.0
Base price
74800.0
Threshold
75000.0

A5_THRESHOLD_SPLITTING · MEDIUM · 2026-03-06 · Not available

A9 · Abnormal Price Reduction

Reported final price is below half the positive base price. A reduction is descriptive and requires source review.

Source evidence
Rule
A9 price reduction: ratio 0.125 outside [0.5, 1.5]
Base price
74800.0
Total effective price
9350.0
Ratio
0.125

A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available

How it works · Read a public contract