Signing is recorded on 2023-09-09 and publication on 2024-04-18, an interval of 222 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
Procedure
Ajuste Direto Regime Geral
CPV
15000000
Contract Type
Aquisição de bens móveis
Location
Portugal, Região Autónoma dos Açores, Ponta Delgada
Portugal, Região Autónoma dos Açores, Ponta Delgada
Portugal, Região Autónoma dos Açores, Ponta Delgada
Portugal, Região Autónoma dos Açores, Ponta Delgada
Portugal, Região Autónoma dos Açores, Ponta Delgada
Portugal, Região Autónoma dos Açores, Ponta Delgada
Portugal, Região Autónoma dos Açores, Ponta Delgada
Portugal, Região Autónoma dos Açores, Ponta Delgada
Portugal, Região Autónoma dos Açores, Ponta Delgada
Portugal, Região Autónoma dos Açores, Ponta Delgada
Portugal, Região Autónoma dos Açores, Ponta Delgada
Portugal, Região Autónoma dos Açores, Ponta Delgada
Portugal, Região Autónoma dos Açores, Ponta Delgada
Publication
2024-04-18
Celebration
2023-09-09
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
Rule
A2/A3 late publication: 222 days after signing (threshold: 10)
Publication Date
2024-04-18
Signing Date
2023-09-09
Days Late
222
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis
A9 · Abnormal Price Reduction
Reported final price is below half the positive base price. A reduction is descriptive and requires source review.
Source evidence
Rule
A9 price reduction: ratio 0.1134 outside [0.5, 1.5]
Base price
115936.0
Total effective price
13151.0
Ratio
0.1134
A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available