Signing is recorded on 2023-12-15 and publication on 2023-12-27, an interval of 12 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
Procedure
Ajuste Direto Regime Geral
CPV
33100000
Contract Type
Aquisição de bens móveis
Location
Portugal, Lisboa, Lisboa
Publication
2023-12-27
Celebration
2023-12-15
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A1 · Repeat Direct Award
At least two direct awards to the same buyer and supplier in the current and two previous calendar years, with base values reaching the configured €20,000 services/goods or €30,000 works amount.
Source evidence
Rule
A1 repeat direct award: 4 awards within 36 months
Number of Awards
4
A1_REPEAT_DIRECT_AWARD · HIGH · 2026-03-06 · Not available
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
Rule
A2/A3 late publication: 12 days after signing (threshold: 10)
Publication Date
2023-12-27
Signing Date
2023-12-15
Days Late
12
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available