Portal BASE · ID 10289425
27 days between signing and publication
AMBIFARO - GESTÃO DE EQUIPAMENTOS MUNICIPAIS E.M. Aquisição de bebidas refrigerantes para os bares do Festival F
Who contracts with whom?
Recorded contract value6,905.00 € legacy reported value
These are contract records, not verified payments or an estimate of money received by each supplier.
Signed 2023-09-15 Published 2023-10-12 27 days between the recorded signing and publication dates.
Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.
27 days between signing and publication
Signing is recorded on 2023-09-15 and publication on 2023-10-12, an interval of 27 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body What explains the gap between the recorded signing and publication dates?
Documents and records to verify Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
The recorded price fields
Base price / estimate 19,990.00 €
Contractual price Not available
Reported final price 6,905.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details Procedure Ajuste Direto Regime Geral CPV 15000000 Contract Type Aquisição de bens móveis Location Portugal, Faro, Faro Publication 2023-10-12 Celebration 2023-09-15
Data coverage Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence Rule A2/A3 late publication: 27 days after signing (threshold: 10) Publication Date 2023-10-12 Signing Date 2023-09-15 Days Late 27 A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis A5 · Proximity to configured amounts Base value lies within 5% below one of the configured comparison amounts. Proximity alone does not establish splitting or a legal violation.
Source evidence Rule A5 threshold splitting: price within 5% below 20000.0 Base price 19990.0 Threshold 20000.0 A5_THRESHOLD_SPLITTING · MEDIUM · 2026-03-06 · Not available
A9 · Abnormal Price Reduction Reported final price is below half the positive base price. A reduction is descriptive and requires source review.
Source evidence Rule A9 price reduction: ratio 0.3454 outside [0.5, 1.5] Base price 19990.0 Total effective price 6905.0 Ratio 0.3454 A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available
How it works · Read a public contract