Portal BASE · ID 9975286

17 days between signing and publication

Universidade Nova de LisboaAquisição de mesas/secretárias elevatórias

Who contracts with whom?

BuyerUniversidade Nova de LisboaNIF 501559094
Recorded contract value40,702.00 €legacy reported value
Recorded suppliersMoodmobler Unipessoal, Lda.

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

17 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

17 days between signing and publication

Signing is recorded on 2023-04-21 and publication on 2023-05-08, an interval of 17 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
46,350.00 €
Contractual price
Not available
Reported final price
40,702.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Consulta Prévia
CPV
39121000
Contract Type
Aquisição de bens móveis
Location
Portugal, Lisboa, Cascais
Publication
2023-05-08
Celebration
2023-04-21

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 17 days after signing (threshold: 10)
Publication Date
2023-05-08
Signing Date
2023-04-21
Days Late
17

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

How it works · Read a public contract