ADRAL - Agência de Desenvolvimento Regional do Alentejo, SAAquisição de serviços de assessoria técnica no âmbito do Projeto Europe Direct Alentejo Central e Litoral para o ano 2023
Signing is recorded on 2023-02-01 and publication on 2023-05-09, an interval of 97 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.