AIRO - Assoc Industrial da Região do OesteAvaliação do projecto Oeste activo<br/>- Definição de metodologia de avaliação;<br/>- Consultadoria de implementação da avaliação (realização dos instrumentos e elaboração de relatórios);<br/>- concepção carta qualidade do projecto e manual de boas praticas;<br/>- Avaliação e monotorização individualizada de todas as acções;<br/>- Elaboração de relatório final
Signing is recorded on 2012-01-30 and publication on 2012-05-23, an interval of 114 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.