Portal BASE · ID 9382571

112 days between signing and publication

Tejo Ambiente - Empresa Intermunicipal de Ambiente do Médio Tejo, EIM, SAAquisição de um Software para Gestão Estratégica, Supervisão e Gestão de Redes no combate às perdas

Who contracts with whom?

Recorded contract value87,554.00 €legacy reported value
Recorded suppliersSYSCRUM

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

112 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

112 days between signing and publication

Signing is recorded on 2022-04-04 and publication on 2022-07-25, an interval of 112 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
295,000.00 €
Contractual price
Not available
Reported final price
87,554.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Concurso público
CPV
48100000
Contract Type
Aquisição de bens móveis Aquisição de serviços
Location
Portugal, Santarém, Mação Portugal, Santarém, Sardoal Portugal, Santarém, Ourém Portugal, Santarém, Vila Nova da Barquinha Portugal, Santarém, Tomar Portugal, Santarém, Ferreira do Zezere
Publication
2022-07-25
Celebration
2022-04-04

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 112 days after signing (threshold: 10)
Publication Date
2022-07-25
Signing Date
2022-04-04
Days Late
112

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

Experimental indicators and advanced analysis

A9 · Abnormal Price Reduction

Reported final price is below half the positive base price. A reduction is descriptive and requires source review.

Source evidence
Rule
A9 price reduction: ratio 0.2968 outside [0.5, 1.5]
Base price
295000.0
Total effective price
87554.0
Ratio
0.2968

A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available

How it works · Read a public contract