Portal BASE · ID 508759
21 days between signing and publication
TIIM - Transportes Integrados e Intermodais da Madeira, S.A. Reparação sistema ar condicionado.<br/>Qaunt. 1.
Who contracts with whom?
Recorded contract value512.00 € legacy reported value
These are contract records, not verified payments or an estimate of money received by each supplier.
Signed 2012-04-23 Published 2012-05-14 21 days between the recorded signing and publication dates.
Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.
21 days between signing and publication
Signing is recorded on 2012-04-23 and publication on 2012-05-14, an interval of 21 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body What explains the gap between the recorded signing and publication dates?
Documents and records to verify Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
The recorded price fields
Base price / estimate 9,280.00 €
Contractual price Not available
Reported final price 512.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details Procedure Ajuste Direto Regime Geral CPV 50730000 Contract Type Aquisição de serviços Location Portugal, Região Autónoma da Madeira, Funchal Publication 2012-05-14 Celebration 2012-04-23
Data coverage Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence Rule A2/A3 late publication: 21 days after signing (threshold: 10) Publication Date 2012-05-14 Signing Date 2012-04-23 Days Late 21 A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis B2 · Supplier Concentration One supplier receives at least 70% of a buyer's recorded awards, with at least 5 buyer and 3 supplier contracts. This is a count comparison.
Source evidence Rule B2 supplier concentration: winner holds 71.2% of authority contracts B2_SUPPLIER_CONCENTRATION · HIGH · 2026-03-06 · Not available
A9 · Abnormal Price Reduction Reported final price is below half the positive base price. A reduction is descriptive and requires source review.
Source evidence Rule A9 price reduction: ratio 0.0552 outside [0.5, 1.5] Base price 9280.0 Total effective price 512.0 Ratio 0.0552 A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available
How it works · Read a public contract