MUNICIPIO DE LAGOSNecessidade urgente de assegurar os trabalhos arqueológicos no âmbito da empreitada de "Remodelação e Ampliação do Museu Municipal Dr. José Formosinho - Núcleo de Arqueologia"
Signing is recorded on 2022-10-18 and publication on 2022-11-03, an interval of 16 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.