Portal BASE · ID 508735

21 days between signing and publication

TIIM - Transportes Integrados e Intermodais da Madeira, S.A.Reparação sistema ar condiconado.<br/>Quant. 1.

What deserves a closer look

Reporting leads

21 days between signing and publication

Signing is recorded on 2012-04-23 and publication on 2012-05-14, an interval of 21 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

Buyer

TIIM - Transportes Integrados e Intermodais da Madeira, S.A.

NIF 511007116

Base price / estimate
9,280.00 €
Contractual price
Not available
Reported final price
1,180.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
50730000
Contract Type
Aquisição de serviços
Location
Portugal, Região Autónoma da Madeira, Funchal
Publication
2012-05-14
Celebration
2012-04-23

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 21 days after signing (threshold: 10)
Publication Date
2012-05-14
Signing Date
2012-04-23
Days Late
21

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

Experimental indicators and advanced analysis

B2 · Supplier Concentration

One supplier receives at least 70% of a buyer's recorded awards, with at least 5 buyer and 3 supplier contracts. This is a count comparison.

Source evidence
Rule
B2 supplier concentration: winner holds 71.2% of authority contracts

B2_SUPPLIER_CONCENTRATION · HIGH · 2026-03-06 · Not available

A9 · Abnormal Price Reduction

Reported final price is below half the positive base price. A reduction is descriptive and requires source review.

Source evidence
Rule
A9 price reduction: ratio 0.1272 outside [0.5, 1.5]
Base price
9280.0
Total effective price
1180.0
Ratio
0.1272

A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available

How it works · Read a public contract