Portal BASE · ID 9623946

16 days between signing and publication

Inspeção-GeralAquisição de 12 cadeiras

Who contracts with whom?

BuyerInspeção-GeralNIF 600061329
Recorded contract value1,708.00 €legacy reported value

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

16 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

16 days between signing and publication

Signing is recorded on 2022-11-30 and publication on 2022-12-16, an interval of 16 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
3,115.00 €
Contractual price
Not available
Reported final price
1,708.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ao abrigo de acordo-quadro (art.º 259.º)
CPV
39130000
Contract Type
Aquisição de bens móveis
Location
Portugal, Lisboa, Lisboa
Publication
2022-12-16
Celebration
2022-11-30

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 16 days after signing (threshold: 10)
Publication Date
2022-12-16
Signing Date
2022-11-30
Days Late
16

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

How it works · Read a public contract