Unidade de Saúde de Ilha de São JorgeAquisição de 2 monitores desfibrilhadores Corplus3, no ãmbito do Plano de Recuperação e Resiliência, Componente 1, Investimento RE-C01-i08-RAA - Hospital Digital - Região Autónoma dos Açores, ação 5 2 1 - Equipamentos para Unidades de Saúde de Ilha, COA e Hospitais
Signing is recorded on 2022-09-21 and publication on 2022-11-08, an interval of 48 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.