Instituto da Água, IPIntervenção de emergência para reabilitação de rombos na defesa aderente entre os esporões norte e sul da praia do Furadouro

Who contracts with whom?

BuyerInstituto da Água, IPNIF 503237965
Recorded contract value103,330.00 €legacy reported value
Recorded suppliersIrmãos Cavaco, S.A.

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

33 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

33 days between signing and publication

Signing is recorded on 2012-03-07 and publication on 2012-04-09, an interval of 33 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
104,000.00 €
Contractual price
Not available
Reported final price
103,330.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
45243000
Contract Type
Empreitadas de obras públicas
Location
Portugal, Aveiro, Ovar
Publication
2012-04-09
Celebration
2012-03-07

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 33 days after signing (threshold: 10)
Publication Date
2012-04-09
Signing Date
2012-03-07
Days Late
33

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available