Associação dos Beneficiários do Plano de Rega do Sotavento do AlgarveManutenção das instalações elétricas das estações elevatórias do Perímetro de Rega do Sotavento do Algarve, nomeadamente Estação Elevatória EE3 ¿ Reservatório de Santo Estevão, Estação Elevatória EE5 ¿ Alto da Asseca, Estação Elevatória EE4 ¿ Santa Rita
Signing is recorded on 2021-10-14 and publication on 2022-05-27, an interval of 225 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.