Portal BASE · ID 8555158
117 days between signing and publication
Freguesia de Olivais Fornecimento de Mercearias para o ano de 2021
Who contracts with whom?
Recorded contract value8,482.00 € legacy reported value
These are contract records, not verified payments or an estimate of money received by each supplier.
Signed 2021-09-01 Published 2021-12-27 117 days between the recorded signing and publication dates.
Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.
117 days between signing and publication
Signing is recorded on 2021-09-01 and publication on 2021-12-27, an interval of 117 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body What explains the gap between the recorded signing and publication dates?
Documents and records to verify Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
The recorded price fields
Base price / estimate 28,000.00 €
Contractual price Not available
Reported final price 8,482.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details Procedure Consulta Prévia CPV 15800000 Contract Type Aquisição de bens móveis Location Portugal, Lisboa, Lisboa Publication 2021-12-27 Celebration 2021-09-01
Data coverage Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence Rule A2/A3 late publication: 117 days after signing (threshold: 10) Publication Date 2021-12-27 Signing Date 2021-09-01 Days Late 117 A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis A9 · Abnormal Price Reduction Reported final price is below half the positive base price. A reduction is descriptive and requires source review.
Source evidence Rule A9 price reduction: ratio 0.3029 outside [0.5, 1.5] Base price 28000.0 Total effective price 8482.0 Ratio 0.3029 A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available
How it works · Read a public contract