Portal BASE · ID 10459419
863 days between signing and publication
Santa Casa da Misericórdia de Ponte da Barca Aluguer de Equipamento Informático e Outro
Who contracts with whom?
Recorded contract value16,782.00 € legacy reported value
These are contract records, not verified payments or an estimate of money received by each supplier.
Signed 2021-09-01 Published 2024-01-12 863 days between the recorded signing and publication dates.
Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.
863 days between signing and publication
Signing is recorded on 2021-09-01 and publication on 2024-01-12, an interval of 863 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body What explains the gap between the recorded signing and publication dates?
Documents and records to verify Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
The recorded price fields
Base price / estimate 16,822.00 €
Contractual price Not available
Reported final price 16,782.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details Procedure Ajuste Direto Regime Geral CPV 30000000 Contract Type Locação de bens móveis Location Portugal, Viana do Castelo, Ponte da Barca Publication 2024-01-12 Celebration 2021-09-01
Data coverage Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence Rule A2/A3 late publication: 863 days after signing (threshold: 10) Publication Date 2024-01-12 Signing Date 2021-09-01 Days Late 863 A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
How it works · Read a public contract