Portal BASE · ID 7581165

27 days between signing and publication

Rota Histórica das Linhas de Torres - Associação para o Desenvolvimento Turístico e Patrimonial das Linhas de Torres VedrasDesenho e Produção de Maquete Táctil no âmbito do projeto Rota Histórica das Linhas de Torres: Comunidade e Turismo Sustentável, capacitando a Rota de suportes 3D relativos a seis Fortes das Linhas de Torres, contribuindo para um trabalho continuado com o público escolar, mas também com todos os visitantes cegos ou com alguma incapacidade intelectual

Who contracts with whom?

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

27 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

27 days between signing and publication

Signing is recorded on 2021-02-24 and publication on 2021-03-23, an interval of 27 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
16,480.00 €
Contractual price
Not available
Reported final price
16,480.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
92522000
Contract Type
Aquisição de serviços
Location
Portugal, Lisboa, Sobral de Monte Agraço
Publication
2021-03-23
Celebration
2021-02-24

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 27 days after signing (threshold: 10)
Publication Date
2021-03-23
Signing Date
2021-02-24
Days Late
27

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

How it works · Read a public contract