Portal BASE · ID 7510425

22 days between signing and publication

MUNICÍPIO DE ALBUFEIRARealização de 400 testes, no âmbito do plano de contingência covid-19, para o ano de 2021

Who contracts with whom?

BuyerMUNICÍPIO DE ALBUFEIRANIF 503539473
Recorded contract value12,040.00 €legacy reported value

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

22 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

22 days between signing and publication

Signing is recorded on 2021-02-09 and publication on 2021-03-03, an interval of 22 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
28,000.00 €
Contractual price
Not available
Reported final price
12,040.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
33100000
Contract Type
Aquisição de bens móveis
Location
Portugal, Faro, Albufeira
Publication
2021-03-03
Celebration
2021-02-09

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 22 days after signing (threshold: 10)
Publication Date
2021-03-03
Signing Date
2021-02-09
Days Late
22

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

Experimental indicators and advanced analysis

A9 · Abnormal Price Reduction

Reported final price is below half the positive base price. A reduction is descriptive and requires source review.

Source evidence
Rule
A9 price reduction: ratio 0.43 outside [0.5, 1.5]
Base price
28000.0
Total effective price
12040.0
Ratio
0.43

A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available

How it works · Read a public contract