Município de ValençaFORNECIMENTO DE GASÓLEO PARA AQUECIMENTO CENTRAL PARA AS ESCOLAS BÁSICAS DO 1.º CICLO (ARÃO, GANDRA, GANFEI, PASSOS - CERDAL E SÃO PEDRO DA TORRE) E JARDINS-DE-INFÂNCIA (ARÃO, GANDRA, GANFEI E SÃO PEDRO DA TORRE) PARA O ANO DE 2026
Signing is recorded on 2026-01-12 and publication on 2026-02-11, an interval of 30 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
Procedure
Consulta Prévia
CPV
09130000
Contract Type
Aquisição de bens móveis
Location
Portugal, Viana do Castelo, Valença
Portugal, Viana do Castelo, Valença
Portugal, Viana do Castelo, Valença
Portugal, Viana do Castelo, Valença
Portugal, Viana do Castelo, Valença
Publication
2026-02-11
Celebration
2026-01-12
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
Rule
A2/A3 late publication: 30 days after signing (threshold: 10)
Publication Date
2026-02-11
Signing Date
2026-01-12
Days Late
30
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available