Portal BASE · ID 7108735

26 days between signing and publication

Escola Básica dos 2.º e 3.º Ciclos Cónego João Jacinto Gonçalves de Andrade, Ribeira BravaAquisição dos Passes Escolares dos Alunos – Campanário – 2020/2021

Who contracts with whom?

These are contract records, not verified payments or an estimate of money received by each supplier.

  1. Signed
  2. Published

26 days between the recorded signing and publication dates.

Dates are displayed in recorded chronological order. A gap alone does not establish a breach of law.

What deserves a closer look

Reporting leads

26 days between signing and publication

Signing is recorded on 2020-09-10 and publication on 2020-10-06, an interval of 26 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

The recorded price fields

Base price / estimate
36,761.00 €
Contractual price
Not available
Reported final price
18,047.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Ajuste Direto Regime Geral
CPV
60100000
Contract Type
Aquisição de serviços
Location
Portugal, Região Autónoma da Madeira, Ribeira Brava
Publication
2020-10-06
Celebration
2020-09-10

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 26 days after signing (threshold: 10)
Publication Date
2020-10-06
Signing Date
2020-09-10
Days Late
26

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

Experimental indicators and advanced analysis

A9 · Abnormal Price Reduction

Reported final price is below half the positive base price. A reduction is descriptive and requires source review.

Source evidence
Rule
A9 price reduction: ratio 0.4909 outside [0.5, 1.5]
Base price
36761.0
Total effective price
18047.0
Ratio
0.4909

A9_PRICE_REDUCTION · LOW · 2026-03-06 · Not available

How it works · Read a public contract