Portal BASE · ID 13154213

22 days between signing and publication

EDIA-EMPRESA DE DESENVOLVIMENTO E INFRA-ESTRUTURASPrestação de Serviços de Manutenção e Beneficiação de áreas florestadas na Herdade dos Estevais, no Monte da Serra e na Herdade da Corte da Lameira e courela das sesmarias

What deserves a closer look

Reporting leads

22 days between signing and publication

Signing is recorded on 2026-01-14 and publication on 2026-02-05, an interval of 22 days. Recorded dates may need correction; this calculation does not establish a legal breach.

Question for the public body

What explains the gap between the recorded signing and publication dates?

Documents and records to verify

Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.

This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.

Buyer

EDIA-EMPRESA DE DESENVOLVIMENTO E INFRA-ESTRUTURAS

NIF 503450189

Base price / estimate
32,600.00 €
Contractual price
Not available
Reported final price
32,510.00 €

Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.

Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.

Main suppliers

Supplier totals use published shares; where unavailable, equal allocation is an estimate.

Contract Details

Procedure
Consulta Prévia
CPV
77231000
Contract Type
Aquisição de serviços
Location
Portugal, Beja, Aljustrel Portugal, Évora, Portel Portugal, Évora, Mourão
Publication
2026-02-05
Celebration
2026-01-14

Data coverage

Source evidence: Portal BASE · Not available

essential fields present: 4 (5)

Missing fields: contractual price

Not available

Risk Flags

An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.

A2 · Late Publication

Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.

Source evidence
Rule
A2/A3 late publication: 22 days after signing (threshold: 10)
Publication Date
2026-02-05
Signing Date
2026-01-14
Days Late
22

A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available

How it works · Read a public contract