Portal BASE · ID 13154213
22 days between signing and publication
EDIA-EMPRESA DE DESENVOLVIMENTO E INFRA-ESTRUTURASPrestação de Serviços de Manutenção e Beneficiação de áreas florestadas na Herdade dos Estevais, no Monte da Serra e na Herdade da Corte da Lameira e courela das sesmarias
22 days between signing and publication
Signing is recorded on 2026-01-14 and publication on 2026-02-05, an interval of 22 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Buyer
NIF 503450189
- Base price / estimate
- 32,600.00 €
- Contractual price
- Not available
- Reported final price
- 32,510.00 €
Values describe contracts, not losses or verified payments. Missing values are not treated as known spending.
Some older records combine contractual and final values. This limitation remains visible until reimport. These are not verified payments.
Main suppliers
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
- Procedure
- Consulta Prévia
- CPV
- 77231000
- Contract Type
- Aquisição de serviços
- Location
- Portugal, Beja, Aljustrel
Portugal, Évora, Portel
Portugal, Évora, Mourão
- Publication
- 2026-02-05
- Celebration
- 2026-01-14
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
- Rule
- A2/A3 late publication: 22 days after signing (threshold: 10)
- Publication Date
- 2026-02-05
- Signing Date
- 2026-01-14
- Days Late
- 22
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available