Município de Póvoa de VarzimFiscalização das Empreitadas: Remodelação e ampliação da Escola EB2/3 Dr. Flávio Gonçalves e Remodelação e ampliação da Escola EB 2/3 de Aver-o-Mar
Signing is recorded on 2020-02-19 and publication on 2020-03-05, an interval of 15 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.