Signing is recorded on 2020-03-26 and publication on 2020-04-14, an interval of 19 days. Recorded dates may need correction; this calculation does not establish a legal breach.
Question for the public body
What explains the gap between the recorded signing and publication dates?
Documents and records to verify
Check both dates against BASE and the signed contract. Ask when the record was submitted and whether it was corrected.
This observation does not establish favouritism, illegality or loss. Verify the documents and seek the public body’s explanation before publishing.
Supplier totals use published shares; where unavailable, equal allocation is an estimate.
Contract Details
Procedure
Consulta Prévia
CPV
31681410
Contract Type
Aquisição de bens móveis
Location
Portugal, Beja, Castro Verde
Publication
2020-04-14
Celebration
2020-03-26
Data coverage
Source evidence: Portal BASE · Not available
essential fields present: 4 (5)
Missing fields: contractual price
Not available
Risk Flags
An indicator describes a pattern in the data. It does not establish wrongdoing. No indicators does not certify a contract.
A2 · Late Publication
Publication is more than 10 calendar days after signing. This configured delay is not a legal deadline determination.
Source evidence
Rule
A2/A3 late publication: 19 days after signing (threshold: 10)
Publication Date
2020-04-14
Signing Date
2020-03-26
Days Late
19
A2_PUBLICATION_AFTER_CELEBRATION · HIGH · 2026-03-06 · Not available
Experimental indicators and advanced analysis
A9 · Price Overrun
Reported final price divided by a positive base price exceeds 1.5; high priority begins at 2.0. Only reimported records with separate contractual prices are compared.
Source evidence
Rule
A9 price increase: ratio 2.9279 outside [0.5, 1.5]
Base price
12000.0
Total effective price
35135.0
Ratio
2.9279
A9_PRICE_ANOMALY · HIGH · 2026-03-06 · Not available