Investigations

Ren Atlântico - Terminal de Gnl S.A

Automated case report generated from contract-level risk evidence.

Executive Highlights

3 companies receive 77.5% of total spend

22 of 22 contracts (100%) have active risk signals

Supplier concentration is high (HHI 0.3196)

Person-company link evidence is available for 0 of 12 winner companies (0%); 12 have no link data

Award timing distribution is within expected bounds: 27.3% in Mar/Jun/Sep/Dec; 9.1% in December

Key Metrics

Flagged Rate
flagged_contracts / total_contracts = 22 / 22 = 100%
HHI Concentration
HHI = Σ s_i² = 0.3196
Interpretation: high supplier concentration
Thresholds: low < 0.15; medium 0.15-0.25; high > 0.25
Company Awarded value Share
Iberdrola Clientes Portugal Unipessoal €14,475,000 52.9%
Prf - Gás, Tecnologia e Construção, Lda €3,500,000 12.8%
Honeywell (Portugal) - Automação e Controlo, S.A. €3,250,000 11.9%

Network Cluster Map

Main cluster focused on this entity with person-company links.

Whole Procurement Map

Global contract links across public bodies and companies

Public mode hides individual nodes and shows only connected-individual totals.

Loading network…

Navigate: drag to pan, use mouse wheel to zoom, and reset view when needed.

Legend Public body Company

Top 30 High-Risk Contracts

Highest combined risk score, with indicator evidence.

Contract Date Value Risk Evidence
PC-2021-000762 - Recondicionamento dos braços de descarga/carga marítimos
9344908
2022-06-01 €3,153,000 65 (2)
A2 · Late Publication (40)
publication_date=2022-07-11 | celebration_date=2022-06-01
C1 · Missing Supplier NIF (25)
rule=C1 no winner recorded: awarded contract (effective price > 0) has no supplier identified
PC-2017-000381 Fornecimento de juntas giratórias e vedantes para os braços de descarga do terminal GNL (suportado em parecer jurídico)
6009866
2017-11-22 €537,082 65 (2)
A2 · Late Publication (40)
publication_date=2019-11-07 | celebration_date=2017-11-22
C1 · Missing Supplier NIF (25)
rule=C1 no winner recorded: awarded contract (effective price > 0) has no supplier identified
Aquisição de Viaturas para a Frota Operacional - 2014_Lotes 2, 3 e 4
1394671
2014-11-07 €663,466 50 (2)
A2 · Late Publication (40)
publication_date=2015-03-02 | celebration_date=2014-11-07
A9 · Abnormal Price Reduction (10)
base_price=1776600.0 | total_effective_price=663466.0
Aquisição de viaturas para a frota operacional do Grupo REN - Lote 3 – 15 viaturas todo-o-terreno (4x4)
728792
2012-12-07 €331,762 50 (2)
A2 · Late Publication (40)
publication_date=2013-03-12 | celebration_date=2012-12-07
A9 · Abnormal Price Reduction (10)
base_price=1078000.0 | total_effective_price=331762.0
PC-2025-000210 - Fornecimento e instalação de Sistemas de interfaces Remote I/O
12453499
2025-07-25 €2,350,000 40 (1)
A2 · Late Publication (40)
publication_date=2026-01-07 | celebration_date=2025-07-25
PC-2023-000640 - Fornecimento de Energia Eléctrica às instalações da REN (ATL e AS)
10757887
2024-04-01 €14,025,023 40 (1)
A2 · Late Publication (40)
publication_date=2024-06-07 | celebration_date=2024-04-01
PC-2023-000725 - Serviços de Manutenção Honeywell 2023-2026
10586649
2024-01-15 €898,025 40 (1)
A2 · Late Publication (40)
publication_date=2024-02-27 | celebration_date=2024-01-15
PC-2023-000207 - Serviços de Manutenção Preventiva ao Sistema de Potência do TA-GNL (3 anos)
10307042
2023-08-02 €599,920 40 (1)
A2 · Late Publication (40)
publication_date=2023-10-23 | celebration_date=2023-08-02
PC-2023-000311 Serviços de elevação e movimentação de cargas para recondicionamento dos braços de descarga marítimos
10286915
2023-09-05 €938,830 40 (1)
A2 · Late Publication (40)
publication_date=2023-10-11 | celebration_date=2023-09-05
PC-2022-000665 - Aquisição de equipamentos, empreitada e serviços, para realização de operações de transshipment
9945722
2022-12-27 €3,222,900 40 (1)
A2 · Late Publication (40)
publication_date=2023-04-24 | celebration_date=2022-12-27
PC-2022-000025 - Fornecimento e instalação de motores elétricos nas bombas P212A, P222A, P232A, P232B e P202
9440814
2022-07-11 €1,014,996 40 (1)
A2 · Late Publication (40)
publication_date=2022-09-08 | celebration_date=2022-07-11
PC-2021-000786 - Serviços de manutenção mecânica e apoio a projetos no Terminal de GNL
9439852
2022-05-27 €639,502 40 (1)
A2 · Late Publication (40)
publication_date=2022-09-07 | celebration_date=2022-05-27
PC-2020-000209 - Serviços de Manutenção Honeywell
7351699
2020-10-02 €728,988 40 (1)
A2 · Late Publication (40)
publication_date=2020-12-22 | celebration_date=2020-10-02
PC-2020-000210 - Serviços de Manutenção Preventiva ao Sistema de Potência do TA-GNL (3 anos)
7260440
2020-07-24 €554,635 40 (1)
A2 · Late Publication (40)
publication_date=2020-11-06 | celebration_date=2020-07-24
PC-2017-000350 - Serviços de Manutenção HONEYWELL "Suportado por parecer jurídico"
6000430
2017-09-19 €585,000 40 (1)
A2 · Late Publication (40)
publication_date=2019-11-04 | celebration_date=2017-09-19
PC-2017-000202 - Serviços Manutenção Preventiva, Corretiva, Condicionada e exploração das Instalações Elétricas do TA - "suportado por parecer jurídico"
5985736
2017-11-09 €531,000 40 (1)
A2 · Late Publication (40)
publication_date=2019-10-28 | celebration_date=2017-11-09
PC-2019-000038 -Upgrade do Sistema de Controlo Distribuído (DCS) - 2ª Fase, no Terminal em Sines, da REN-Atlântico - suportado em parecer jurídico
5977519
2019-05-29 €930,203 40 (1)
A2 · Late Publication (40)
publication_date=2019-10-24 | celebration_date=2019-05-29
Upgrade/Migração da plataforma EXPERION
4267006
2017-09-11 €473,184 40 (1)
A2 · Late Publication (40)
publication_date=2018-02-20 | celebration_date=2017-09-11
Implementação de sistema de monitorização nos compressores K301A/B/C existentes no Terminal de GNL
4217774
2017-07-29 €575,069 40 (1)
A2 · Late Publication (40)
publication_date=2018-02-05 | celebration_date=2017-07-29
Impressão - Fornecimento de equipamentos e serviços (3 anos)
2216272
2016-02-01 €349,621 40 (1)
A2 · Late Publication (40)
publication_date=2016-06-01 | celebration_date=2016-02-01
Fornecimento de Energia Eléctrica às Instalações da REN
936065
2013-07-09 €5,426,467 40 (1)
A2 · Late Publication (40)
publication_date=2014-01-03 | celebration_date=2013-07-09
PC-2023-000866-Upgrade de sistemas criticos LTD's (Level, Temperature & Density) - Fornecimento de sistemas
11599534
2024-04-04 €499,992 20 (1)
C3 · Missing Mandatory Fields (20)
missing_fields=cpv_code | rule=C3 missing mandatory fields: cpv_code

Award Timeline

Monthly award volume and amendment risk signals.

Period Awards Awarded value Amendment signals
2012-12 1 €331,762 0
2013-07 1 €5,426,467 0
2014-11 1 €663,466 0
2016-02 1 €349,621 0
2017-07 1 €575,069 0
2017-09 2 €1,058,184 0
2017-11 2 €1,068,082 0
2019-05 1 €930,203 0
2020-07 1 €554,635 0
2020-10 1 €728,988 0
2022-05 1 €639,502 0
2022-06 1 €3,153,000 0
2022-07 1 €1,014,996 0
2022-12 1 €3,222,900 0
2023-08 1 €599,920 0
2023-09 1 €938,830 0
2024-01 1 €898,025 0
2024-04 2 €14,525,015 0
2025-07 1 €2,350,000 0

Risk scoring combines rule-based indicators with data quality flags. Values and confidence degrade when critical fields are missing.