FREGUESIA REBORDÕES SANTA MARIA
Automated case report generated from contract-level risk evidence.
Executive Highlights
3 companies receive 97.7% of total spend
9 of 10 contracts (90%) have active risk signals
Supplier concentration is high (HHI 0.6156)
Person-company link evidence is available for 0 of 4 winner companies (0%); 4 have no link data
Award timing distribution is within expected bounds: 40% in Mar/Jun/Sep/Dec; 10% in December
Key Metrics
| Company | Awarded value | Share |
|---|---|---|
| Predilethes - Construções, L.da | €370,772 | 76.7% |
| CaetanoBus-Fabricação de Carroçarias,S.A | €74,694 | 15.4% |
| Construções Mazesi, Lda | €27,010 | 5.6% |
Network Cluster Map
Main cluster focused on this entity with person-company links.
Whole Procurement Map
Global contract links across public bodies and companies
Public mode hides individual nodes and shows only connected-individual totals.
Navigate: drag to pan, use mouse wheel to zoom, and reset view when needed.
Top 30 High-Risk Contracts
Highest combined risk score, with indicator evidence.
| Contract | Date | Value | Risk | Evidence |
|---|---|---|---|---|
|
Pavimentação da Rua do Rabião e Beneficiação do Campo de Futebol e Área Envolvente
11535943
|
2025-06-13 | €16,863 | 85 (2) |
B2 · Supplier Concentration
(45)
winner_entity_id=3795 | contracting_entity_id=35437
A2 · Late Publication
(40)
publication_date=2025-06-25 | celebration_date=2025-06-13
|
|
Pavimentação da Rua do Outeiro, Rua da Costeira e Rua de Nogueira
10247666
|
2023-08-15 | €49,844 | 85 (2) |
B2 · Supplier Concentration
(45)
winner_entity_id=3795 | contracting_entity_id=35437
A2 · Late Publication
(40)
publication_date=2023-09-19 | celebration_date=2023-08-15
|
|
Beneficiação das Ruas de Mariz, Sobreus, Cocherras, Fonte da Costeira e Cobraceira
6975858
|
2020-09-07 | €61,392 | 85 (2) |
B2 · Supplier Concentration
(45)
winner_entity_id=3795 | contracting_entity_id=35437
A2 · Late Publication
(40)
publication_date=2020-09-19 | celebration_date=2020-09-07
|
|
Requalificação da Travessa de Pedrouços e Rua da Bouça de Sequeiros
5867801
|
2019-08-28 | €17,086 | 85 (2) |
B2 · Supplier Concentration
(45)
winner_entity_id=3795 | contracting_entity_id=35437
A2 · Late Publication
(40)
publication_date=2019-09-24 | celebration_date=2019-08-28
|
|
Pavimentação da Rua de São Brás e Travessa da Boa Nova
11215255
|
2025-02-03 | €149,294 | 80 (2) |
B2 · Supplier Concentration
(45)
winner_entity_id=3795 | contracting_entity_id=35437
A5 · Threshold Splitting
(35)
base_price=149654.0 | threshold=150000.0
|
|
Aquisição de um Mini Autocarro de passageiros de 26 Lugares + Guia +Motorista
823994
|
2013-08-12 | €74,694 | 75 (2) |
A2 · Late Publication
(40)
publication_date=2013-09-04 | celebration_date=2013-08-12
A5 · Threshold Splitting
(35)
base_price=74694.0 | threshold=75000.0
|
|
Pavimentação de Diversas Ruas da Freguesia
11085539
|
2024-12-13 | €58,750 | 45 (1) |
B2 · Supplier Concentration
(45)
winner_entity_id=3795 | contracting_entity_id=35437
|
|
Execução de Acesso ao Parque de Lazer do Trovela
10861733
|
2024-08-08 | €13,805 | 45 (1) |
B2 · Supplier Concentration
(45)
winner_entity_id=3795 | contracting_entity_id=35437
|
|
Fornecimento e montagem de equipamento adicional para viatura pesada de passageiros de 26 lugares +guia+ motorista
824027
|
2013-08-13 | €11,000 | 40 (1) |
A2 · Late Publication
(40)
publication_date=2013-09-04 | celebration_date=2013-08-13
|
Award Timeline
Monthly award volume and amendment risk signals.
| Period | Awards | Awarded value | Amendment signals |
|---|---|---|---|
| 2013-08 | 2 | €85,694 | 0 |
| 2019-08 | 1 | €17,086 | 0 |
| 2020-09 | 2 | €88,220 | 0 |
| 2023-08 | 1 | €49,844 | 0 |
| 2024-08 | 1 | €13,805 | 0 |
| 2024-12 | 1 | €58,750 | 0 |
| 2025-02 | 1 | €149,294 | 0 |
| 2025-06 | 1 | €16,863 | 0 |
Risk scoring combines rule-based indicators with data quality flags. Values and confidence degrade when critical fields are missing.